Industrial Effluent → Ultra-Pure Water System · Please provide the information required for final design, guarantees and commercial evaluation.
Basic information required to associate the technical data with the correct facility.
KLD = Kilolitres per day; MLD = Million litres per day. 1 MLD = 1,000 KLD.
Critical for pretreatment, membrane selection, recovery and guarantees.
Primary risk driver for UF, NANRo and EDI reliability.
If not available, can TOC testing be arranged?
Defines clarification, UF sizing and CIP frequency.
Essential for RO design, antiscalant strategy and recovery.
Affects cooling design, CAPEX and energy optimisation.
Defines whether split-stream or full ultra-pure water is required.
Major cost and feasibility driver.
Our system will recover 80% to 90% of treated effluent or operate a closed-loop system subject to final design.
Affects cost, corrosion risk and OPEX.
Information required for project planning and commercial evaluation.
Attach supporting information so the final design and commercial offer can be based on verified data.
Final design, recovery, guarantees and pricing will be based on the information confirmed through this questionnaire and supporting data.